The CoMPAS roadmap is based on the CoMPAS product vision and the CoMPAS mission and related objectives.
Objectives per theme
Theme | Now | Next | Later |
---|---|---|---|
Specification Build SCL based specifcations | |||
Manual Engineering Engineer a substation by hand | |||
Automatic SCD generation | |||
Testing Test SCL files on certain aspecs | |||
SCL insights (engineering) Publish SCL files to get insights in to the configurations | Protection settings "API" Data quality settings "API" | ||
SCL insights (scanned) Publisch actual substation settings by scanning the substation (not with with CoMPAS) |
Disclaimer:
This roadmap is only for communication purpose. Their are no guarantees on what get delivered and when. If you like your feature to be included? Get involved in the development (directly or via a 3th party).
Please note that CoMPAS heavily relies on OpenSCD for the front-end and manual editing.
Committed:
More basic features
IED services
SCD generation
Better plug-in architecture (OpenSCD-core initiative)
CoMPAS-SCT libary
Idea's for the future:
Modbus support
61850 gateway support (61850-90-2)
More easy SCL checking
Workflow support
Single line editor
Substation logic
Integration SCD generation into front-end
(API) Service for protection settings and measurements
HMI generation (61850-6-2)
Substation logic (IEC 61850-90-11)
User rights
Functional block | Priority rank | Comment |
CoMPAS-SCT libary | 1 | Improve library with the ability to fully generate a substation |
CoMPAS automated generation process | ||
Integrast CoMPAS-SCT with front-end | Collaboration possible with RTE and Alliander | |
SCL validation with schematron | Work in progress | |
Schedulingnodes support | ||
SCL file reports of testing purposes | ||
Idea's for future development:
Modbus support
(API) Service for protection settings and measurements
HMI generation (61850-6-2)
Substation logic (IEC 61850-90-11)
User rights
Code Development Processes
Initial Roadmap Presentation
The initial roadmap of the project was drafted by a design team involving several grid operators and T&D automation vendors:
Roadmap status July 2022
Functional block / workstream | Priority rank | Comment |
Reference architecture | 1 | Done, see: CoMPAS Architecture (com-pas.github.io) |
System Configuration | 1 | Partly possible with manual steps |
Testing | 2 | Work in progress |
IEC61850-CIM mapping | 2 | Done |
System specification | 3 | Done |
Profiling | 3 | Done |
For the current features, check CoMPAS - CoMPAS - LF Energy